CI Glossary

Change Order
Changes to the original scope of a project authorized by the owner
CL
Abbreviation for centerline which is the middle of the pipe and what most pipelines are given a height to be installed to
CMU
Concrete Masonry Unit. Basis unit used for concrete block construction
Combined Sewer
Sewer line that collects both sanitary and storm water and conveys them in the same line
Concrete Bench
Concrete formwork inside a junction manhole installed to reduce turbulence
Conformed documents
Contract documents that have been posted with the addenda, RFI and field orders. A full set of contract documents.
Contractor's Stamp
A form or stamp attached to each shop drawing that certifies the attached submittal has been reviewed and deviations are listed as follows.
COP
Change Order Proposal