Sanitary Sewer
Sewer line constructed to transport only sanitary wastes
SCADA
Supervisory Control and Data Acquisition
Schedule of Values
A line by line description of how much each activity will be paid and at what time interval for a pay requisition.
SDR
Abbreviation for standard dimension ratio, which is a means for reporting pipe pressure ratings
Shop Drawing
A submittal prepared by the contractor based on design documents that will be the supplied equipment
Shop Drawing
Product documentation submitted by a contractor showing conformance to the project documents.
Slump Test
A field measured test of concrete. The concrete design mix will determine what slump range is acceptable.
Soldier Pile
Vertical members in trench shoring system
Spawl
Chips/flakes broken away from a concrete surface
Spot Elevation
Ground elevation at a specific location
Spring line
In a circular pipe the half the full depth
Staging Area
An area desginated for the contractor to place equipment and materials while await use.
Storm Sewer
Sewer line constructed to transport stormwater only
String Line
A line mason or carpenter utilizes to set block to
Sub-Contractor
A contractor hired by the primary Contractor to complete a specific task
Superintendent
Contractor representative responsible for monitoring a project for compliance with the project documents; also known as a ""Super"""